DETAILED INFORMATION

DATE:

2017 – 2017

LOCATION:

Logan Lake, B.C.

CLIENT:

Tech Highland Valley Copper Partnership

VALUE:

$1.2 Million

PROJECT SNAPSHOT

Lower Nicola Site Services (LNSS), a partnership between Infracon and the Lower Nicola Indian Band Development Corporation, was contracted to construct a 3.6-km high-density polyethylene and carbon steel pipeline to connect the booster station in the Lornex Pit to the million-gallon tanks at the operating level of the mine. LNSS also constructed the haul road crossings and haul road detours.

KEY HIGHLIGHTS

  • 1,200 M 14” carbon steel piping.
  • 1,600 M 18” DR11 HDPE piping
  • 880 M 14” DR 17 HDPE piping.
  • 500 M 8” DR09 HDPE piping.
  • 33 per cent of employees were Indigenous.
  • 876.5 Indigenous man-hours dedicated to project.