Loading...

DETAILED INFORMATION

DATE:

2018

LOCATION:

Fort Fraser, B.C.

CLIENT:

Regional District of Bulkley Nachako

VALUE:

$3.3 Million

PROJECT SNAPSHOT

Infracon was contracted by the Regional District of Bulkley Nechako to install a comprehensive new water system for the majority of the community of Fort Fraser, B.C. During the project, smoky conditions from nearby forest fires added to the challenging conditions; however, Infracon still met the client’s schedule.

KEY HIGHLIGHTS

Work included decommissioning the old AC Main. The project was challenging due to the high water table and multiple unknown utilities, as the existing system was over 50-years-old.  Infracon completed the project utilizing its fleet of GPS equipment, including excavators from JD 50 – JD 350 and support equipment, such as skid steers, water truck and compaction equipment.

  • Installation of 4,000 Lm of 150 mm and 200 mm water main.
  • Installation and tie in of 150 water services.
  • 4,000 m2 of road restoration.
  • Installation of 20 fire hydrants.

ARE YOU READY TO START YOUR NEXT PROJECT WITH US?

RELATED PROJECTS