Loading...

DETAILED INFORMATION

DATE:

2025 – 2027

LOCATION:

Logan Lake (HVC)

CLIENT:

Teck Highland Valley Copper Partnership Fluor

VALUE:

$74,000,000 – T&M / Unit Rate

PROJECT SNAPSHOT

Lower Nicola Site Services (LNSS) was contracted by HVC on multiple scopes as part of their Mine Life Extension (MLE) project. Scopes included: Early Civil Works, Site Wide Services (SWS), Concrete Batch Plant and Concrete Supply, and Crushing Services. The SWS contract included multiple scopes ranging from construction of laydowns and roads to janitorial and snow clearing services. Scopes have been continuously added to LNSS’ contract by HVC after realizing our capacity to take on more complex scope and bring in additional equipment from our large fleet. Added scopes included relocation of an active 36” HDPE tailings line, excavation and hauling of tailings material (7 Day Pond), installation of underground utilities and other large civil scopes. The Concrete Batch Plant scope included mobilization and setup of a portable batch plant and concrete trucks to produce and deliver over 35,000m3 of high strength concrete for various contractors on-site. LNSS also has 3 crushing spreads producing various aggregates for the MLE project and stemming and road crush products for HVC’s operations. LNSS daily personnel counts regularly exceeds 100 people to perform all the scopes in our Contracts.

KEY HIGHLIGHTS

  • 35,829m3 Concrete Supply
  • 490,000m3 Cut/Fill Earthworks
  • 230,000m3 aggregate production
  • 35 trailers to service (janitorial, water, sewage)
  • Supply/maintenance of >30 generators and light plants