DETAILED INFORMATION

DATE:

2021 – 2022

LOCATION:

Highway 5 Coquihalla,
Highway 8 Merritt to Spences
Bridge

CLIENT:

Yellowhead Road and Bridge; City of Merritt

VALUE:

$7 Million

PROJECT SNAPSHOT

Due to heavy torrential rainfall in November of 2021 crippling the transportation corridors from the interior of British Columbia to the Lower Mainland, Infracon, along with Lower Nicola Site Services (LNSS) — a partnership between Infracon and the Lower Nicola Indian Band Corp. — were contracted to protect infrastructure and replace roads in the washed-out areas extending along the Coquihalla Hwy, Highway 1, Highway 8 and into the city of Merritt, B.C.  Infracon and LNSS mobilized within hours of the natural disaster, rerouting equipment and manpower from the Trans Mountain Expansion Project, which was temporarily shut down due to safety and environmental concerns.

KEY HIGHLIGHTS

  • Produce, load, haul and place riprap to protect infrastructure and create river diversions.
  • Reconstruct roadways for emergency access.
  • Perform large debris and obstruction removal.
  • Construct crane pads and staging areas for bridge replacements.
  • Provide environmental control measures for river diversions and river crossings.
  • Protecting the TMX pipeline and the environment.
  • Channel diversion of flood waters.
  • Production and placement of aggregates.
  • Temporary and permanent bridge abutment construction.
  • Slope stabilization.
  • Supply and installation of drainage culverts.
  • Community access reinstatement.