Infracon successfully completed the water management infrastructure project for Anglo American’s Peace River Coal operation in the summer of 2014. The project was particularly challenging given the terrain, the extremely tight construction window and the high degree of environmental controls needed to mitigate the construction impacts on the adjacent environmentally sensitive Babcock Creek near Tumbler Ridge. As Project Director, I was very impressed by the professionalism of the Infracon’s site team, their willingness to work together with the client project team and their expertise in the operation of GPS controlled equipment. As a result the project exceeded expectation by achieving the safety, environment, quality, time and budget milestones.