1) Calculations of quantities for major and minor bridge.
2) Execution of piling work , pile cap , abutment and abutment cap , and PSC I-girder.
3) Casting and Erection of I-girder.
4) Ensure that the quality of work done as per specifications.
5) Study of drawings, specifications and BOQ AND highlighting discrepancies if any to superiors.
6) Managing of site engineers, foreman and site supervisors.
7) Attend queries of the client engineer.
8) Making the work area 100% accident free by finding the hazards identification and rectification.
9) Scheduling of construction equipment’s at work place for optimum utilization.
Education
-
2004 /2007
B-Tech in Civil Engineering at Delhi Institute of Engineering Studies
-
Drawing
-
1999 /2003
Diploma in Civil Engineering at Government Polytechnic Gorakhpur
-
Estimating and casting
-
1998/1999
10th pass at Pawa Nagar Inter Collage Fazil Nagar Kushinagar
-
Game
Experience
-
July-2016 to Till Date
Associate Manager at GMR Infrastructure Limited
-
1) Estimating of quantities for major and minor bridge.
2) Execution of piling work, pile cap , abutment and abutment cap and PSC I-girders.
3) Ensure the quality of work as per ISO specifications and attend queries of the client.
4) Billing of sub-contractors.
5) Erection of PSC I-girder and Steel girders. -
Dec.-2015 to June-2016
Structure Manager at Barbrik Projects Ltd.
-
1) Execution of open foundations and RCC T-Beam girder 25 mtr.
2) Preparation of daily work program and managing site staff.
3) Coordinating with client for all purposes. -
Nov.-2013 to May-2015
Structure Manager at N.K.C Project Pvt. Ltd.
-
1) Execution of open foundations and RCC T-Beam girder 15.56 mtr.
2) Steel girder launching and fixing 36.30 mtr.
3) Operating total station to locate points.
4) Preparation of daily work program and managing site staff.
5) Coordinating with client for all purposes. -
Feb.-2012 to Oct.-2013
Senior Engineer at PBA Infrastructure Limited
-
1) Execution of open foundations and PSC I- girder 32.00 mtr. and 25.00 mtr. and girder erections.
2) Specially work in RE Panel and RE Block in 6 locations.
3) Preparation of daily work program and managing site staff.
4) Coordinating with client for all purposes. -
Oct.-2011 to Feb.-2012
Site Engineer at Royal Infraconstru Limited
-
1) Studying of drawings and making drawings for shuttering and preparation of bar bending schedule.
2) Hands an experience in execution of well foundations and PSC I-girder 28.25 mtr.
3) Preparation of daily work program and managing site staff. -
Nov.-2007 to Aug.-2011
Engineer at Mittal Brothers Engineers and Contractors
-
1) Studying of drawings and making drawings for shuttering.
2) Preparation of bar bending schedule.
2) Hands an experience in execution of well foundations, well cap, pier and abutment wall , pier cap and abutment cap.
3) Preparation of daily work program and managing site staff. -
July-2003 to Oct.-2007
Junior Engineer at Malhotra Buildcon Pvt. Ltd.
-
1) Studying of drawings and layout making as per site requirement.
2) Preparation of bar bending schedule.
3) Hands an experience in execution of well foundations, well cap, pier and abutment wall , pier cap and abutment cap.
4) Preparation of daily work program and managing site staff.
To contact this candidate email santoshsinghmbec@gmail.com