E M I N M A M M A D O V
Email: mammadovconsulting@gmail.com 360 Bayview Way SW Airdrie, AB, T4B 4H4
tel: 1(403) 608 0373 Canada
• Proficient in MS Office Suite, Power BI, Maptec, Volcan, Blu Beam, Navisworks 3D. Experience with AutoCAD
• Knowledge of marine/civil construction, piling, structural steel, site assessments, wind power, remediation.
• 19 years of experience in EPCM, EPC, EPCIC environment working with multidiscipline teams.
• Understanding of the relationship between procurement, design, production, EHS and QC.
• Strong work ethics, communication/interpersonal skills. Working knowledge of contractual agreements.
• Excellent HSE culture & work ethics. Solid understanding of EPC, Construction & Project Controls
• Fluent in English, German, Russian, Turkish, Azerbaijani. Well organized/punctual character.
• Background in hydro dam, renewable energy, reclamation/dredging and industrial projects.
• Well experienced with Primavera P6. Strong understanding of the ISO 90001,450001 2008 Quality System.
• Strong skills in overall project planning and guidance in value engineering, schedule and site costs
DESCRIPTION OF DUTIES ON PROJECTS:
Baku Naval Base Expansion / Works Manager/Consultant (June 2020 to Feb 2021)
o Led construction works. Authorized payments to subcontractors. Understanding of Regulatory Processes.
o Prepared schedules, monitored the progress achieved. Oversaw financials. Coordinated with estimators.
DAKII SERVICES (COASTAL GAS LINK PIPELINE) Assistant PM (Forestry, Clearing) (July 2019-June 2020)
o Worked with contract administration, cost control. Developed construction and logistics execution plans.
o Coordinated site operations and contractual aspects, prepared schedules, managed communications, QA/QC.
Peace River Hydro Partners (Planning and Interface Specialist) Fort St. John BC, Canada
Site C Hydro Dam Project (JV Samsung-Acciona) ($6.75 bln) (July 2017 to May 2019)
o Developed and updated complex multidisciplinary schedules for various sections of the project
o Established and led all interface matters for the JV (interdisciplinary, subcontracts, client related, HSE)
o Worked on permits, led planning for civil works, coordinated shop drawings, RFIs, client correspondence.
Fluor Canada, Fort Hills Utilities, Suncor (Planning/Turnover Specialist) (July 2013-July 2017)
o Reviewed planning and scheduling deliverables (Schedule Development and Control Plan)
o Provided updates to the integrated project schedule (IPS) monthly. Coordinated field work.
o Analyzed change orders, reported field progress, tracked cost and revenue. Maintained a punch list
o Provided technical quality assurance, prepared construction budgets by analyzing technical drawings
Site Manager (National Marine Dredging Company) (Jan 2010 – May 2013)
The Upper Zakum Z750 project involved the construction of four production artificial islands comprising of a central
complex which housed the processing facilities, and the north, south and west satellite platforms (930 mln $) Abu Dhabi
Ghantoot Naval Base Project for the Ministry of Defense (UAE)/ Dredging, Rockworks and other civil scope
o Worked on evaluation of time and schedule impacts. Ensured all documents were approved prior to use
o Provided project workforce forecast. Interfaced with Client representatives & supervised subcontractor works
Offshore Operations Superintendent “Jan De Nul (1.2 bln $) (Jan 2007-Dec 2009)
Manifa Artificial Islands and Causeway Construction in KSA/Ras Laffan Port Expansion Project in Qatar
o Managed technical documentation, coordinated work activities of multiple sub-contractors.
o Ensured implementation of specifications, worked on method statements and construction plans.
River Crossings Superintendent, (Pipeline) BRITISH PETROLEUM (3.9 bln $) (Jan 2004-Dec 2006)
The Baku–Tbilisi–Ceyhan (BTC) pipeline is a 1,768 kilometres long crude oil pipeline.
o Ensured that prep work is executed as per specifications, design & contract requirements.
o In charge of high erosion sections, micro tunneling activities. Worked on construction plans, permits
Engineer, Ruwais-Shweihat 42’ Gas Pipeline Project (UAE) for GASCO. (Sept 2002 – Oct 2003)
o Ensured completion of the project Pre-Construction, Pre-Operation, and Operations Transition Compliance
o Communicated Quality requirements to project teams and stakeholders, identified deficiencies
Education: Kiel University, Germany (MSc in Coastal/Civil Engineering)Cover Letter
Dear Sir/Madam,
Please find enclosed my resume in application for the position advertised.
Educated in one of the oldest Universities in Germany, (Christian Albrecht University in Kiel) I have an extensive
experience in EPCM/EPC, EPCIC, environmental assessments, reclamation, civil construction, oil and gas, client
management and team lead experience on nearshore and marine works, causeway/bridge/dredging, pipeline
construction, pile driving, engineering/civil infrastructure development projects.
Experience in the hydro power sector and other large infrastructure projects. Knowledge and working experience
with structural drawings, regulatory permitting process for provincial and federally regulated infrastructure
projects.
Understanding critical path scheduling and assuring minimum sufficient project float. Experience with community
relations and communications and knowledge of Indigenous-specific values and sites of significance.
Familiarity with energy industry technology (turbines, balance of plant) and contracts (construction, supply,
operations, interconnection, offtake, and/or asset management contracts); understanding of budgets and financial
model. I have been successful in developing successful relationships with clients, consultants, sub-contractors and
other project stakeholders throughout my professional work life and became fluent in 5 languages.
My career started from the QHSE department and continued for many years in dredging/rock work operations and
project controls sector, which enabled me to grasp key disciplines to start and deliver any project within time frame
and allocated cost, using knowledge of relevant Federal, Provincial and Municipal policies.
Among other strong sides of my character, I can also mention ability to deal with people of various professional
and cultural background, ability to lead and learn in new environments.
I respect people and I have the patience to listen to them. It helps me to understand them and ultimately allows
me/us to achieve overall goal that is set upon the team.
Thank you for taking the time to consider this application and I look forward to hearing from you in the
near future.
Reference are available upon request.
Yours sincerely
Emin Mammadov
Education
-
1996/2002
MSc in Engineering at University of Kiel, Germany
Experience
-
2002/2003
QHSE at DODSAL
-
2004/2006
River Crossings Superintendent at BTC Pipeline Project, British Petroleum
-
2007/2009
Superintendent at Jan De Nul Dredging Ltd
-
2010/2013
Works Manager at National Marine Dredging Company
-
2013/2017
Planning, Controls and Turnover at Fluor
-
2017/2019
Planning and Interface at Site C Hydro Dam PRHP
-
2019/2020
Assistant Project Manager, COASTAL GAS LINK Pipeline Project at Dakii Services
-
2020/2021
Works Manager at Ministry of Defense
To contact this candidate email mammadovconsulting@gmail.com