Lower Nicola Site Services (LNSS), a partnership between Infracon and the Lower Nicola Indian Band Development Corporation, was contracted to construct a 3.6-km high-density polyethylene and carbon steel pipeline to connect the booster station in the Lornex Pit to the million-gallon tanks at the operating level of the mine. LNSS also constructed the haul road crossings and haul road detours.