Interior Region Flood Repairs

Detailed Information

DATE:

2021 – 2022

LOCATION:

Highway 5 Coquihalla, Highway 8 Merritt to Spences Bridge

CLIENT:

Yellowhead Road and Bridge; City of Merritt

VALUE:

$7 Million

PROJECT Snapshot

Due to heavy torrential rainfall in November of 2021 crippling the transportation corridors from the interior of British Columbia to the Lower Mainland, Infracon, along with Lower Nicola Site Services (LNSS) — a partnership between Infracon and the Lower Nicola Indian Band Corp. — were contracted to protect infrastructure and replace roads in the washed-out areas extending along the Coquihalla Hwy, Highway 1, Highway 8 and into the city of Merritt, B.C.  Infracon and LNSS mobilized within hours of the natural disaster, rerouting equipment and manpower from the Trans Mountain Expansion Project, which was temporarily shut down due to safety and environmental concerns.

interior_flood_repair_project_2

Key Highlights

  • Produce, load, haul and place riprap to protect infrastructure and create river diversions.
  • Reconstruct roadways for emergency access.
  • Perform large debris and obstruction removal.
  • Construct crane pads and staging areas for bridge replacements.
  • Provide environmental control measures for river diversions and river crossings.
  • Protecting the TMX pipeline and the environment.
  • Channel diversion of flood waters.
  • Production and placement of aggregates.
  • Temporary and permanent bridge abutment construction.
  • Slope stabilization.
  • Supply and installation of drainage culverts.
  • Community access reinstatement.

WESTPRO INFRASTRUCTURE

“Infracon successfully completed a project for Westpro Infrastructure in Fort McMurray, Alberta in the summer 2013. I found their management team to be committed to the completion of a top quality project. Infracon personnel were knowledgeable, hard-working and professional in all aspects of their work. Infracon simply performed a miracle – mobilized in one week notice and was able to complete earth and civil works on time in spite of the record-breaking wettest summer in 30 years.”