BC Hydro – Bear Mountain Project
LNB was hired by Harder Associates to do the site preparation for the BC Hydro Bear Mountain hydro substation. The site works included:
- Cut to fill site to prepare for new substation
- Build roads for access to substation
- Completed ditching and culvert installation for the site
- Worked near overhead hazards within the BC Hydro substation
- Building of a 43,000 m2 hydro pad
- 12,000 m2 of stripping
- 25,000 m3 of common excavation / cut and fill
- 10,000 m3 of gravels and aggregates placed
- 800 lineal meters of ditching
LNB was hired by Harder Associates to do the site preparation for the BC Hydro Bear Mountain hydro substation. The site works included:
- Cut to fill site to prepare for new substation
- Build roads for access to substation
- Completed ditching and culvert installation for the site
- Worked near overhead hazards within the BC Hydro substation
- Building of a 43,000 m2 hydro pad
- 12,000 m2 of stripping
- 25,000 m3 of common excavation / cut and fill
- 10,000 m3 of gravels and aggregates placed
- 800 lineal meters of ditching