Anglo American: Peace River Coal
Water Management and Gordon Creek Arch Culvert

  • Between 2012 and 2014, LNB was contracted for various works on Anglo American’s Peace River Coal mine site in Tumbler Ridge
  • In 2012 and 2013, LNB was responsible for the provision of a haul road for mining equipment The project included a multi-plate that was roughly 12mx12mx44m, along with road construction and water management
  • In 2015, LNB was again contracted by PRC for the water management project. The scope on this project included construction of roads, settling ponds, and collection ditches
  • Approximately 500,000m3 of material moved including nearly 80,000m3 of blasted rock
  • 83,304 combined man hours with no incidents