12th Street Capital works
LNB was contracted to sub-excavate 1.5 meters below the original road surface and backfill with compacted structural fill to provide a stable base and prolong the lifespan of the new asphalt and sidewalks that were installed. While the road was excavated we performed several upgrades to existing water, sewer and storm drain systems.
Missing AttachmentMissing Attachment
LNB was contracted to sub-excavate 1.5 meters below the original road surface and backfill with compacted structural fill to provide a stable base and prolong the lifespan of the new asphalt and sidewalks that were installed. While the road was excavated we performed several upgrades to existing water, sewer and storm drain systems.
Missing AttachmentMissing Attachment